Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0230-0004-E]
Application
4 overhead cranes in a factory for concrete parts
Country
Switzerland
City
6072 Sachseln
Project installation date
2017
Representative office
Conductix-Wampfler AG [CH]
Operator
Fanger Kies + Beton AG
Technical requirement[s]
• Energy and Data for crane crabs
• Control signals for pendant controller
Travel distance [Load]
• 2 x 22 m
• 2 x 18 m
Product[s]
Festoon System, Program 0230
Cable[s]
• Flat cables
• Round cables
Environmental condition[s]
Dusty
Flat cable trolleys
Round cable trolleys
Accessories
1) depending on roller size/ roller material